Oil Gas Boiler

Oil Fired Steam Boiler Oil Fired Steam Boiler Oil Fired Steam Boiler Oil Fired Steam Boiler
Oil Fired Steam Boiler Oil Fired Steam Boiler Oil Fired Steam Boiler Oil Fired Steam Boiler

Oil/Gas Steam Boiler

Model: WNS Series Industrial Steam Boilers

Steam Capacity: 0.5T/H-20T /H

Pressure: 0.4Mpa ~ 2.5Mpa (Customizable)

Fuel: Natural Gas, LPG, LNG, CNG, Biogas, City Gas, Diesel, Heavy Oil, Oil and Gas

Details


Product Introduction

Oil Gas Fired Boiler is a safe, efficient and fully automatic heating equipment. This series of equipment is horizontal, fire tube,three return, wet back structure, with high efficiency, small volume, convenient installation, simple operation, stable operation,wide range of application and other characteristics.


 

WNS Series Steam Boiler Main Technical Parameters
Model Rated
steam
Rated
steam
Steam 
temperature
(°C)
Thermal
efficiency
Oil Gas Dimension Weight
capacity
(t/h)
pressure
(Mpa)
(%) (kg/h) (N㎡/h) (m) (t)
WNS1-
0.7/1.0-Y(Q)
1 0.7/1.0 194 ≥98.36 61 73 3.2×1.9×2.2 4.9
WNS2-
1.0/1.25-Y(Q)
2 1.0/1.25 194 ≥98.36 121 145 4.2×2.3×2.5 8
WNS3-
1.0/1.25-Y(Q)
3 1.0/1.25 194 ≥98.36 182 217 4.5×2.1×2.4 9
WNS4-
1.0/1.25-Y(Q)
4 1.0/1.25 194 ≥98.36 243 289 5.0×2.3×2.6 11
WNS6-
1.25/1.6-Y(Q)
6 1.25/1.6 194 ≥98.36 367 435 5.4×2.4×2.7 18.6
WNS10-
1.25/1.6-Y(Q)
10 1.25/1.6 194 ≥98.36 601 735 6.3×2.7×3.2 20.5
WNS15-
1.25/1.6-Y(Q)
15 1.25/1.6 194 ≥98.36 906 1101 8.9×3.4×3.6 42
WNS20-
1.25/1.6-Y(Q)
20 1.25/1.6 194 ≥98.36 1211 1467 7.8×3.6×4.0 52
 
CWNS Series Main Technical Parameters of Hot Water Boiler
Project Model CWNS0.35 CWNS0.7 CWNS1.05 CWNS1.4 CWNS2.1 CWNS2.8
Size M 2.9*1.5*1.7 2.7*1.6*1.9 3.2*1.6*1.9 3.4*2.2*2.4 3.4*2.2*2.6 4.3*2.3*2.6
Weight T 2.5 3.75 5.6 7.7 8.9 10.1
Power MW 0.35 0.7 1.05 1.4 2.1 2.8
Pressure Mpa 0
Outlet Water
Temperature
85 85 85 85 85 85
Return Water
Temperature
60 60 60 60 60 60
Boiler Efficiency / ≥96%
Applicable Fuel / Natural Gas, liquefied Natural Gas, City gas, Light Oil
Fuel
consumption
Natural
Gas
NM³/h 37 73 109 145 212 286
Liquefued
Petroleum
Kg/h 29 57 85 115 172 229
City Gas NM³/h 79 155 232 302 463 601
Light Oil Kg/h 31 61 92 118 185 235
Gas supply pressure Natural Gas Mbar 70-100 100-150 100-150 100-150 150-200 150-200
City Gas Mbar 100-200 100-200 100-200 100-200 150-200 150-200
Rated Water Circulation M³/h 12 24 36 48 72 96
Boiler Water Volume 1.1 3.05 5.2 5.9 13.1 15.8










 

 

Tooling Equipment

ab0b50896ed0d718bf730df1747f959

Sales service

1. Boiler quality guarantee: We have our own factory, we can guarantee the boiler production efficiency and quality!

2. Feedback on the production progress in real time. We will send you pictures and videos of the production of boilers and auxiliary machine parts so that you can better understand the production process.

3. Reliable Transportation: Yuji Boiler has been cooperating with experienced freight forwarding companies for many years to ensure that the products reach their destination safe and sound. We have an overseas installation team to provide installation, commissioning and regular door-to-door maintenance.

4. Strict and complete inspection system: We have complete X-ray inspection, water pressure inspection, leak test and other systems to ensure 100% throughput before product delivery.
 

Production Process

Production Process

01. Raw material preparation

1. Material re-inspection: Ensure materials meet standards

2. Pretreatment of materials: Surface derusting and non-destructive testing, plate calibration

3. Cutting process: CNC cutting machine for lofting and processing

02. Forming welding and heat treatment

1. Forming: The drum is integrally formed. Using corrugated furnace process

2. Welding: Automatic welding, beautiful appearance, low repair rate and high efficiency

3. Correction: The welded drum is rounded to ensure the roundness of the drum

Production Process
Production Process

03. Testing and testing

1. Non-destructive testing: Non-destructive testing, mechanical performance testing

2. Hydrostatic test: Check its strength and tightness

3. Trial burning: Safety and Stability Tests

04. Packaging and transportation

1. Paint: First remove rust, then apply antirust primer, and finally apply high temperature resistant metal paint

2. Packaging: Packaging with special equipment

3. Transportation: Ensure safe and fast transportation of boilers and auxiliary equipment

Production Process

Certificate

  • CE Certificate

    CE Certificate

  • NGV Certificate

    NGV Certificate

  • Trade Certificate

    Trade Certificate

  • Production Certificate

    Production Certificate

  • Production Certificate

    Production Certificate

  • Production Certificate

    Production Certificate

< >

Order Process

  • Online Consultation

    Online Consultation

  • Provide Free Solution

    Provide Free Solution

  • Video See Factory

    Video See Factory

  • After-Sales Service

    After-Sales Service

  • Quality Assurance

    Quality Assurance

  • Get The Best Product

    Get The Best Product

FAQ

How to get a detailed and exact offer?

faq

Please let us know your required steam capacity, working pressure or steam temperature, fuel type. Then our aftersales-engineer will send you the detailed and exact offer.

How long does it take to get the boiler ready?

faq

Usually our company have new stocks, we can manage the shipping within 5-10 days. But you please contact us salesman to confirm in advance.

Can you assist us to do the installation and operation training?

faq

Yes, our company will provide the drawings and operation manual. Also you can contact us for help, then our engineer can give you the technical supports online.

What are the differences between vertical type boiler and horizontal type boiler with the same capacity?

faq

1. Structure of vertical boiler is compact, occupy a limited area.

2. Convenient on installation and removal.

3. Low cost and investment on capital construction. Steam exhausted fast and sufficient.

4. The combustion space of horizontal is big, fuel can be burned completed.

5. The thermal efficiency is higher than the vertical boiler.

6. Horizontal type: less thermal loss, stronger output, and higher steam quality.

How long is the product warranty period?

faq

Our boilers have one year warranty period or depending on your requirements.

How can you get the best price quickly?

faq

1. We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.

2. Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.

Why should you believe our boiler quality?

faq

1. Strength calculation report with applied materials information.

2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.

3. 100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler.

4. Hydrostatic test: ensure the standard working pressure and safety.

5. Third-party inspection report:By Henan Boiler Inspection Institute.

6.Passed ISO:9001 ,ISO14001,OHASA18001 and CE certificate.

  • Our Advantage

    1. We have 20, 000 m² factory area, More than 200 employees. We can efficiently complete your delivery project.

    2. Our boiler vessel export to more than 100+ countries, Well Received by Customers.

    3. Our boiler vessel have passed the ISO 9001 system certification, EU CE and other international certifications, worthy of your trust.

    4. Through the quotation consultation form you submitted, we will give you a quotation and construction solution in the shortest time.

  • Customize Your Boiler vessel

Related Products

Send Inquiry×

The price will be sent soon via email.